Special tools required:
NOTE: When replacing the rubber mount in the wishbone, a wheel alignment .
Necessary preliminary work:
Press rubber mount out with special tools 31 1 051 , 31 1 054 and 33 3 054 .
Installation note:
Keep rubber mount and bore in control arm clean and free from grease.
Press rubber mount in and out at chamfered side of wishbone bore hole.
Installation note: Protrusion (A) = 5.74 Â+- 0.3 mm.
After installation: Carry out wheel alignment procedure .
BMW X3 Service & Repair Manual > Body repair instructions: Working with 2-component PU cavity foam
Properties of cavity foam:
2-component PU foam, solvent-free.
Excellent flow capacity, enabling complete sealing of cavities.
Good strength, preventing slipping in cavities.
Low water absorption, preventing corrosion.
Ideal for use as insulating and sealing compound
Information on dan ...