IMPORTANT:
- The toe link must be installed with the opening (U-section) facing downward!
- If the toe link is bent, the control arm/wheel carrier screw connection must be renewed.
NOTE: If the toe link is detached from the rear axle support, it will be necessary to carry out the wheel alignment procedure .
Necessary preliminary work:
Open clips and remove cable for pulse generator.
Installation note:
Replace defective clamps.
Release screw (1).
Installation note:
Replace screw.
The toe link must be installed with the opening (U-section) facing downward! Tighten down screw connection in NORMAL POSITION .
Mark position of eccentric adjustment washer to rear axle support to simplify subsequent adjustment of rear axle.
Release nut (2) and remove screw.
Installation note:
Replace nut.
Tighten down screw connection in NORMAL POSITION .
Installation note: When installing, ensure that the tapered side of the bearing bush is connected first toward the wheel carrier.
After installation:
BMW X3 Service & Repair Manual > Body repair instructions: Notes on using temperature-controlled infra-red radiators
When using temperature-controlled infrared radiators, damage to adhesive bonds, paint and vehicle components
can occur when drying spatula and filler.
The temperature sensors in the infrared radiator only operate reliably on large, even surfaces.
On small surfaces such as C-pillars or sills, ...